- Apply using a long pile roller or soft brush spreading over the surface at a rate of 4-6m²/Itr depending on surface condition.
- Allow to dry for 2-4 hours then apply a second coat.
DO NOT use any vehicles on the restored surface for a minimum of 24 hours following application. Drying time is 24 hours from final application. - Remove as much product as possible from tools and clean immediately with soapy water.
COVERAGE: 1 Litre covers 4 – 6m²
(depending on porosity and texture of the surface).