Martin Galligan, Glasnevin Trust Project Manager

Martin Galligan, Glasnevin Trust Project Manager

Posted on 18Sep

Client

When presented with the PROTECTiT SRD I have to say I was sceptical, to say the least. The PROTECTiT team started to impress me with a scientific approach, the analysis was so detailed and accurate, all of the tests were carried out and presented very quickly. But what really surprised me and my colleagues were the instant results within 4-6 weeks of the installation. I have now installed the second unit in the Church and another one in the Tower.


John McPartland, Dublin City Council

Posted on 12Nov

Client

Following our conversation, I have not carried out a cost saving exercise but I can give you the experience we have with Store Street plaza. Since the area has been sealed it takes the crew around forty minutes to wash down the plaza as food and drink staining is not embedded in the stone and does not require the concentrated effort that was previously required to remove it. The saving has been in time and allows the crew to move on to other areas instead of spending a half a day on one location.”


NRA in Ireland

Posted on 12Nov

Client

The National Roads Authority in Ireland has, since 2008, been protecting structures within the national road network using ‘PROTECTiT100’ supplied by PROTECTiT SP. Since application, those structures which have been treated have shown no apparent signs of material deterioration or distress whilst their as-constructed aesthetic appearance has been maintained, with no obvious surface contamination or fungal growth.


Back to Top